Some news about my layout.
I have worked on several subjects.
Ballast tests :







Tortoise motor and turnouts wiring.
The second curve is ready, I have still to set the Peco’s bretelle double, and the track 3 and 4.


I have worked on the platform ; some passengers wait the train (the time can be long !).


6 Responses to Work, wiring, landscape and tests